Sample
Kitchen
3-02
Office building, floor 3
Approved
Checklist v4
- Counters and handles wiped16 pointsdone
- Disinfectant applied10:00 contactdone
- Sink and appliancesPhotodone
- Supervisor approvalD. Reyesdone
- Spot check, in personMetdone
CleanZ turns each clean into one sealed record. Your approved cleaning checklist, which a hospital calls its protocol, sets the steps. The cleaner follows them on a phone with a timer for each disinfectant, a supervisor approves, and the person who runs spot checks adds the results. Every record shows which version of your checklist applied that day.
Sample
Kitchen
3-02
Office building, floor 3
Approved
Checklist v4
CleanZ is preparing its first pilots for 2027 and is looking for design partners in hospitals and other facilities. Learn about the pilot
Features marked Pilot are in the first release for design partners. Features marked Planned come later, when a design partner needs them.
Build your cleaning steps from templates. Every change creates a new version, and each record keeps the version used that day. A room or area's status picks its checklist, so a room that needs extra care loads the right product, PPE and extra steps.
Your approved disinfectants, each with its EPA registration number, contact time and required PPE. The cleaner's timer comes from here, so the contact time on screen matches the product in use.
Scan the room or area, follow one step per screen, and finish. Large buttons work with gloves, instructions come in English, Spanish or Cantonese, and everything saves without a signal. If something blocks a step, such as broken equipment or no product, the cleaner records why in two taps.
The person who runs spot checks logs fluorescent and ATP results on a sample of cleans, with a photo. Each result keeps its method, device model and the threshold that applied, because ATP readings are not comparable across meter brands.
Before a clean can be submitted, CleanZ checks that every required step, product, timer and photo is present. If something is missing, the screen says exactly what.
A live board of every room and area's status, a review queue for one-tap approval or rework, and search by room or area and date.
Approved records are sealed. Later changes are added as new entries, never edits, so failures and rework stay visible. Export any record as a one-page PDF, or everything as CSV.
Each version starts when a design partner needs it, not on a fixed date.
First paid pilot, planned for 2027
After the first paid pilot
With the first multi-site customer
A person replies within one business day.